Northamptonshire based. Working nationwide.

HOTELS

Passive Fire Protection for Hotels

Hotels rely on passive fire protection in corridors, risers, ceiling voids and between guest rooms. DC Fire Protection carries out fire stopping, barrier installation and remedial works, planned around the way your hotel operates.

Stock: hotel hallway

Work that suits an operating hotel

Tell us which floors, rooms and public areas can be closed and when. Work is easier to plan in phases when the hotel’s occupancy and busy periods are known from the start.

Corridors, risers and voids

Service routes, risers and ceiling voids are where openings and gaps often need attention. Send the drawings, report or schedule of works you hold and we can discuss what the installation involves.

Records for the building

Agree what documentation you need alongside the installation scope, so your team has a clear record of the work carried out. Bolster supports the way we organise installation records.

Fire barrier fabric enclosing a timber roof truss, fixed with green brackets

Refurbishment and remedial work

Whether the work is part of a refurbishment or follows a report on an existing building, tell us where the hotel is, how many floors or rooms are involved and the dates you are working to. We can discuss the scope and what is needed next.

How a hotel enquiry works

  1. Tell us about the building and what you need
  2. Send the drawings, specification or report you have
  3. Agree the scope, access and programme
  4. Carry out the work and provide the agreed records

Have a hotel project to discuss?

Send the building location, programme and whatever drawings, report or specification you have. We will tell you what else we need to discuss the scope.

Call Enquire