Northamptonshire based. Working nationwide.

MILTON KEYNES

Fire Stopping and Passive Fire Protection in Milton Keynes

DC Fire Protection can discuss Milton Keynes projects with you from its Northamptonshire office. Contact us about fire stopping, passive barrier installation and remedial works for your building or programme.

Passive fire barrier fixed in a ceiling void with green fixings and a red cable run
Head-of-wall junction beneath a profiled roof deck, with insulated and wrapped service supports

Talk through the next step

Send the building location, the drawings or report you have and your proposed programme. We will discuss whether the work is within our scope and what is needed next.

What helps us respond

Hotels and commercial buildings

Operating buildings need work planned around the people using them. Read how we approach hotel projects.

What to include when you contact us

The building location, the drawings or report you have, the approximate areas involved and your programme dates give us a useful starting point. Please avoid sending sensitive building information through the public form; mention it and we will arrange a suitable way to share it.

How an enquiry works

  1. Tell us where the building is and what you need
  2. Send the drawings, specification or report you have
  3. Agree the scope, access and programme
  4. Carry out the work and provide the agreed records

Have a project or remedial works requirement to discuss?

Tell us about the building, its location and the work you need. If you already have a report, drawings or a schedule of works, mention them in your enquiry so we can discuss the next step.

Call Enquire